Foundation Cost Estimator
Price the part of the building you'll never see again. Pick a foundation type and structure size — get concrete volume, granular base tonnage, and an itemized 2026 cost estimate with editable prices. Not sure which type? The slab vs frost wall guide resolves that decision first.
Structure & Foundation
Adjust unit prices (CAD, editable)
Quantities & Cost Breakdown
| Item | Quantity | Cost |
|---|
How this estimate works
Slab: concrete volume = area × thickness (+10% waste), granular base = area × depth × 1.8 t/m³ with compaction allowance, plus mesh/rebar and forming/finishing labour at your editable rates. Frost wall adds perimeter × depth × the formed-wall rate to a standard slab. Piers: perimeter ÷ spacing, at your per-pier installed price. Wood floating floor prices the PT skid-and-joist system per square foot — common for sheds under ~160 sq ft where code permits (see the permits guide). The result is shown ±15%.